Description of Work | Client | Year |
Gabon Andem Hospital Project Andem Gabon Geotechnical Consultancy | Optimum Cunstruction Trade DMCC | 2024 |
Gabon City Of Democracy Of Libreville Project Geotechnical Consultancy | Optimum Cunstruction Trade DMCC | 2024 |
Sakarya Filyos Natural Gas Processing Plant Project Switchyord Area Phase 2 Factual And Gedechnical Evalvation Reports |
Güngör Elektrik | 2023 |
Hatay Erzin PDH-PP Project Gerotechnical Assessment and Seismic Risk Analysis Report | BY POLİMER | 2023 |
TP-OTC Social Center Housing Geotechnical Report, Designing of Retaining System | Werner Sobek | 2022 |
SENEGAL; Dakar , Radisson Hotel, Housing and Shopping Mall Geotechnical Report and Consultancy | SUMMA | 2022 |
RWANDA; Kigali Amahoro Stadium Geotechnical Report and Consultancy | SUMMA | 2022 |
SENEGAL; Dakar International Blaise Diagne Airport- Pedestrain Viaduct, Terminal and Train Station and Cargo Terminal Geotechnical Report and Consultancy | SUMMA | 2022-2019 |
Merkez Ankara Project Phase C Geotehnical Report | Pasifik- Merkez Adi Ort. | 2022 |
Hatay Erzin Industrial Plant Geotechnical Consultancy | BAYEGAN | 2022 |
Sakarya Filyos Gaz Sahası Geotechnical Design Report | Schlumberger | 2021 |
SENEGAL ; Dakar National Stadium , Strip Mall and Athletic Stadium Geotechnical Report and Consultancy | SUMMA | 2021-2020 |
RWANDA; Kigali NISS Headquarter Geotechnical Report and Consultancy | SUMMA | 2021 |
SENEGAL ; Dakar Turkish Embassy Geotechnical Report | SUMMA | 2021 |
NIGER ; Diffa Airport Control Tower Geotechnical Report | SUMMA | 2021 |
SIERRA LEONE; Lungi Airport New Terminal, Presidential Terminal Building and other New Structures Geotechnical Report and Consultancy | SUMMA | 2021 |
Özbekistan Tashkent Combined Cycle Powerplant Geotechnical Consultancy | Aksa Enerji | 2021 |
Merkez Ankara Project Soil Investigation and Foundation System Evaluation Report | Pasifik- Merkez Adi Ort. | 2021 |
Tufanbeyli Thermal Power Plant Coal Stock Structure Ground Project | Enerjisa | 2020 |
BENIN; Cotonou New Sofitel Hotel Geotechnical Report, Consultancy and Dewatering Design | SUMMA | 2020 |
Akkuyu NPP 6. Regional Geological Studies Consultancy | ENVY | 2020 |
Technopark Project Consultancy Services | Kocaeli Üniversitesi | 2020 |
NIGER Ministry of Finance Geotechnical Consultancy and Retaining Sysytem Design | SUMMA | 2019 |
NIGER Congress Palace Tent Structure Geotechnical Report | SUMMA | 2019 |
Bağdat Besmaya Power Plant Project Consultancy | Tefirom Inc. | 2019 |
Kırıkkale Independent Power Plant Ground Improvement Design | Samsung | 2019 |
NIGER Niamey Presidential Hotel Geotechnical Report and Consultancy | SUMMA | 2018 |
NIGER, Diori Hamani International Airport MainTerminal and Presidential Pavillion Geotechnical Report and Consultancy |
SUMMA | 2018 |
RWANDA ; Kigali Sport Arena Geotechnical Report and ConsultancyArena | SUMMA | 2018 |
Batman Airport Area Works Quality Control | Muhlis Alper İnşaat | 2017 |
Kırşehir-Petlas Tire Factory Raw Material and Product Crests Area Geotechnical Report | Petlas | 2017-2016 |
Ankara Dikmen Vadisi Residental Project Retaining System Implementation Project | Pasifik-Astra Ortak Girişimi | 2017 |
CONGO / Barazaville Ministry Building Geotechnical Report and Consultancy | SUMMA | 2016 |
Senegal / Dakar Expo Center and Business Hotel Geotechnical Report and Consultancy | SUMMA | 2016 |
Senegal / Dakar Sport Arena Geotechnical Report and Consultancy | SUMMA | 2016 |
Ankara Metropolitan Municipality Residence Project Retaining System Application Project | Pasifik Inc. | 2016 |
Çorum Town Hall Application Project | MN Mühendislik | 2016 |
Prime Ministry Building Facilities Retaining System Application Project | Rönesans Holding | 2016 |
CONGO / Barazaville City Hotel and Shopping Mall Geotechnical Consultancy | SUMMA | 2015 |
Congo/Brazaville Kintele Congress Center Geotechnical Report and Consultancy | SUMMA | 2015 |
Venezuella /Caracas Housing Complex Geotechnical Consultancy | SUMMA | 2015-2014 |
Lique Faction Assesment Report For Akkuyu NPP Project | JSC Atomstroyexport / ENVY | 2015-2016 |
Equatorial Quinea, Senegal and Congo Convention Center Geotechnical Consultancy | SUMMA | 2015-2011 |
Çankırı Karatekin University Landslide Area Bored Pile Project | Çankırı Karatekin University | 2015 |
Tüprag Kışladağ Tesisleri Faz 4 Earth Works Quality Control | Tekmar | 2015 |
Ankara Cepa İncek Residental Project Retaining System Application Works | Üstünçelik Inc. | 2015 |
Ankara-Bahçelievler Housing Project Retaining System | Yepasan | 2014 |
Ankara İncek- Prestij Housing Foundation Piles | Fırat-Dema İnşaat Ortaklığı | 2014 |
Uşak, Kışladağ Gold Mine Construction Earth Works Quality Control and Supervision | Eldorado Gold Cooperation (Tüprag) | 2014-2005 |
Senegal/Dakar International Congress Center Geotechnical Report and Consultancy | SUMMA | 2014-2013 |
Tüprag Mine Site Earth Works and Consultancy | Tüprag A.Ş | 2014 |
Eryaman Fırat Life Style Konutları Temel Kazıkları Projesi | Fırat-Dema Ortak Girişimi | 2013 |
Tufanbeyli Thermal Power Plant Geotechnical and Soil Improvement Design | SK Engineering & Const. Co. | 2011-2012 |
AKKUYU Nuclear Power Plant Hydrogeological Investigation | JSC Atomstroyexport / ENVY | 2012-2011 |
İzmir, Efemçukuru Gold Mine Construction Soil Works Quality Control and Supervision | Eldorado Gold Cooperation (Tüprag) | 2008-2012 |
Gaziantep – Birecik Motorway Construction Control and Consultancy | General Directorate of Highways | 2001 -2012 |
Riga-Latvia Combined Cycle Power Plant Geotechnical Consulting | GAMA | 2012 |
Eylül Business Center Retaining Wall Design with Mini Piles and tieback anchors | Eylül Ltd. Co | 2012 |
Ereğli Karapınar Highway Pavement Design | General Directorate of Highways | 2012 |
İstanbul Ümraniye Cultural Center 24m.deep Excavation Design of Retaining System | Limak Co. | 2012 |
Aras Business Center Retaining Wall Design with Piles and tieback anchors | Macit Yapı Ltd.Co. | 2012 |
Design of Altın Koza University 32m.deep Excavation Design of Retaining System with Piles and tieback anchors | Altın Koza University | 2012 |
Erzincan-Çöpler Gold Mine Construction Soil Works Quality Control and Supervision | ANAGOLD Mining Co. (Anatolia Minerals) | 2009-2011 |
Çankaya Residence 30m.deep Excavation Design of Retaining System with Piles and tieback anchors | ITO Yatırım ve Turizm Co. | 2011 |
Ege Plaza and Dogus Oto Ankara Showroom 26m.deep Excavation, Design of Retaining System with Piles and tieback anchors | Ege Grup Inc. | 2011 |
Next Level Complex Project 34m deep excavation Design of Retaining System with Piles and tieback anchors | Pasifik Inc. | 2011 |
Abu Nawas Hotel Retaining Wall and Foundation Piles Design | Alinma Holding Company – TRİPOLİ | 2010 |
69 Tower 18m. Pit excavation, Design of Retaining System with secant Piles and tieback anchors | Libyan African Portfolio-TRİPOLİ | 2010 |
Riga-Latvia Combined Cycle Power Plant Geotechnical Consultancy | GAMA Power Systems JSC | 2009 |
Roketsan Migyem Tesisleri Soil Works Quality Control and Supervision | Nur İnşaat Co. | 2009 |
Sinop – Boyabat Dam ve HES Projject Design of Slopes of Dam | Teknik Mühendislik . / DSİ | 2009 |
Özalp-Erciş Yolu Kavşak Projesi Geoteknik Rapor Hazırlanması | Geogis Kent Bil.Sis.Tic.Ltd.Şti. | 2009 |
Van Tatvan Devlet Yolu/Van Emn.Müd.Kavşağı Geoteknik Projelendirmesi | Geogis Kent Bil.Sis.Tic.Ltd.Şti. | 2009 |
TOBB Üniversitesi Yurt Binaları – Sosyal Yapılar Temel Kazısı İksa Sistemi Projesi | TOBB | 2009 |
İzmir – Efem Çukuru Altın Madeni Plant Sahası Tesisleri Geoteknik Proje + Danışmanlık Hizmetleri, Ulaşım Yolu Üstyapı ve Iksa Sistemi ve Kuzey Çıkış Dolgusu Projeleri | Eldorado Gold Coorperation (Tüprag) | 2008- 2009 |
Iraq Sulaimani American University Presidency Building Filter Evaluation | AUIS-American University of Sulaimani | 2008 |
Ankara-Beypazarı Tarihi Kurşunlu Camii Restorasyonu Zemin Islah Projesi | Çağdaş Elek. İnş. Ltd. Co. | 2008 |
Strain-gage instrumentation on support pipes of the retaing wall of Subway Station of Ankara(including mounting, monitoring and evalutaion),and Phase III İnclinometer installation, monitoring and evaluation. | GÜRİŞ Inc | 2008 |
Russia-Moskow Shatura 400MW Power Plant Soil Investigation Supervision and Bored Foundation Evaluation | GAMA Co. | 2008 |
Ankara-100.yıl Business Center Retaining System Design | Ekol Hazır Giyim Ltd. Co. | 2008 |
Instrumented Pile Load Test Performance (with strain-gages) in Sabiha Gökçen Airport New International Terminal Project | Limak-GMR-Malaysia Airports . | 2008 |
Bursa Aroma Fruit Juice Factory Design of Warehouse foundation piles and retaining System | Teknik İnşaat Ltd.Co. | 2008 |
Libya-Nalut Cement Factory Evaluation of Foundations of Heavyweight Structures | GAMA Co. | 2007 |
Esenboğa Airport Parking Garage, Design for Reinforcing Foundation of the Canopy | TAV | 2007 |
Ankara-Çayyolu Private Clinic Retaining System Design | İrfan Gürler | 2007 |
Dogus Automotive Ankara and Bursa Showroom and Service Buildings Retaining System Design | Doğuş İnşaat Co. | 2007 |
Georgia Batum Sheraton Hotel Geotecnical Report, Design of Bored Piles and Retaining System | Nurol İnşaat Co. | 2007 |
Ankara-Pursaklar Business Center Retaining System Design | Çıraklar Ltd.Co. | 2007 |
Ankara-Çankaya Limak Head Office Building Expansion Retaining System Design | Limak İnş.Co. | 2007 |
Sinop Boyabat Highway Landslides Improvement Projects and Consultancy | Doğuş İnş. Co. | 2001-2007 |
S.Arabia-Rabigh Cement Factory, Consultancy for Foundation Design of Generator and Crusher Units | GAMA Inc | 2006-2007 |
YANBU Saudi Arabia Alrajhi Iron and Steel Facility Geotechnical Consultancy | GAMA Inc. | 2006 |
NIJNIY Novgord District Viksa Hotel Geotechnical Consultancy | 2006 | |
Rusya Molzharinovka Iron and Steel Facility Geotechnical Consultancy | 2006 | |
Rabigh Cement Factory Geotechnical Consultancy | GAMA Inc.- Moushegah Arabia | 2006 |
Nijegorodakoya – Viska City Steel Factory Extension Geotechnical Consultancy | GAMA Inc. | 2006 |
Ankara Çankaya Housing and Work Center Excavation Retaining System Design | Yapi Kredi Koray G.M.Y.O. | 2006 |
Ankara – Ankara Housing Excavation Retaining System Design | 2006 | |
Kalecik Kırıkkale Intersection Landslide Protection Project | General Directorate of Highways (TCK) (4. District) | 2006 |
Pervuvroisk Sverdbuskaya Iron Steel Factory Geotechnical Consultancy | GAMA Inc. | 2005 |
Slope Protection Project for Approach Fills of Dinar and Corcor Viaducts on Elazığ Tunceli Highway | Karyol Cons. Inc. | 2005 |
Ankara Göksu Park Landslide Protection Project | Ankara Municipality | 2005 |
Körfez,Samandağ and Kuşadası Sewage Pumping Stations, Impervious Retaining Systems Design | Iller Bank | 2004-2005 |
Kuleli Conference Hall Soil Nailed Retaining Wall Design | KFS Cons. Inc. | 2004 |
Karaburun Education and Settling Facility Soil Nailed Retaining Wall Design | Ministry of Defence, İzmir Construction Group | 2004 |
Yukarı Mercan Hydroelectric Power Plant Main Water Lines Ground Improvement Project | İçtaş Inc. | 2004 |
Design and Consultancy of Diyarbakır Sewage Retaining Wall Systems | Önka Inc. | 2003-2004 |
Polatlı Peripheral Highway Design | General Directorate of Highways | 2003 |
Geotechnical Consultancy of AŞTİ-Çayyolu Subway Construction | Prokon- Optim –Obermayer JV | 2002 – 2003 |
Göcek Marina Tourism Complex Villa Channels Retaining Wall Design | Tempo Altyapi Ltd. Co. | 2002 |
Fethiye Sewage System Main Collector Lines Soil Improvement Project | Kiska Inc. | 2002 |
Bozüyük Primary School Impermeable Retaining Wall Design for excavation | Bilecik Bayındırlık Müdürlüğü | 2002 |
Gaziantep-Birecik Motorway and Gaziantep Peripheral Motorway Final Design | General Directorate of Highways (TCK) | 1997-2002 |
Ankara-Pozantı Motorway Acıkuyu-Ortaköy Section Preliminary and Final Design | 1997-2002 | |
45 Towns Geotechnical design for Sewage Projects | Iller Bank | 1992-2002 |
K. Maraş Ozel Idare Business Center retaining Wall Design | K. Maraş Municipality | 2000 |
Ankara Tomurcuk Street No:12, Strengthening of Foundations by Underpinning | Apartment Management | 2000 |
TEK Foundation Bahçelievler Work Center, Foundation Excavation Mini Piled, Anchored Retaining Wall | I.S. Aktay Cons. Co. | 2000 |
ATA-BİLGE Construction Coop., Foundation Design of Block 6 | Ata-Bilge Yapı Koop. | 2000 |
Adapazarı Sewage Lines Sheet Pile Walls Design | İller Bank | 2000 |
Sugözü Thermal Power Plant Coal Storage Area Soil Improvement Project and Construction Supervision | Siemens | 2000 |
Denizli-Aydın Motorway Kuyucak-Denizli Section Geotechnical Preliminary Design | General Directorate of Highways | 1998-2000 |
İncirlik AB, Installation of Main Benchmarks by GPS | Radian International | 1999 |
Sonmak Primary School Retaining Wall Design | Sonmak Inc. | 1999 |
Türkkonut II.Ankara Multi-Housing Area Foundation Piles and Retaining Wall Design of the Mosque | Türkkonut | 1999 |
Bandırma, Railway Bridge Foundation Design | Bandırma Municipality | 1999 |
Köyceğiz, Isparta and Dalyan Waste Water Treatment Plants Foundation Design and Supervision | Riza AKKAYA Inc. | 1999 |
Erkilet Airport Taxiway and Apron Restoration Projects | NATO (Yalçin Teknik Inc.) | 1999 |
SODAŞ Çardak Factory Soda Silo Foundation Design | SODAŞ Inc. | 1997 |
Taşkent Governmental Hospital, Landslide Protection Project | Konya Bayındırlık Müdürlüğü | 1997 |
Ankara Sewerage Project Wastewater and Stormwater System, Hatip Collector Piled Foundation design | Ankara Municipality (ASKİ) | 1997 |
Menevis Street No:21, Underpinning of Foundations of the Apartment | Apartment Management | 1997 |
Batikent Güvenç Housing Coop., Underpinning of Foundations and Strengthening of Blocks 16. and 17. | Güvenç Yapı Koop. | 1997 |
Güngen Office Building, Anchored Retaining Wall Design | Güngen Inc. | 1997 |
Ankara Dogan Printing Center, Anchored Retaining Wall and Improvement of Concrete Roads by In ection Design | Aydın Cons. Co. | 1997 |
İzmir Durgunoglu Office Building, Foundation Piles and Impermeable Retained Wall Project | Kızılkanat Inc. | 1997 |
Adana Bossa Factory Wastewater Treatment Plant, Retained Wall Design for Foundation Excavation | Bossa Inc. | 1997 |
Bored Piled Retaining Wall System Design for DSI Sultanhisar 800m Irrigation Channel Cut and Cover Project | General Directorate of State Hydraulic Works (DSİ) | 1995-1997 |
Geotechnical Design of Tarsus Connection of Mersin-Tarsus Highway (Km 3+000 – +782) and Soil Improvement Project of D-400 Connection | Doğuş İnşaat Inc. | 1996 |
Ankara Sewerage Project Main Discharging Channel, Retained Wall Project of Konya Road Bridge Passage Hipodrom Street. | Ankara Municipality (ASKİ) | 1996 |
Samsun Zinzade Business and Housing Project Design of Anchored-Bored piled Retaining System for 11m. Deep Excavation. | Kadıoğlu İnşaat Ltd. Co. | 1995 |
Geotechnical Design for Gaziantep-Birecik Motorway Preliminary Design | Kutlutaş Müh.Ltd. Co. | 1994 |
Soil Improvement Projects for Sapanca Waste Water Treatment Plant | İller Bank | 1993 |
Soil Improvement Project for Extension of the Runway of Sinop Airport | General Directorate of Airports (DLH) | 1993 |
Geotechnical Consultancy for NATO and Military Facilities (a.Problems at shelter doors at Incirlik Air Base, b.Flight line restoration of Incirlik Airport, c.Landslide protection of Maçka mine storages, d.Soil improvement for the shelters at Çigli and Akhisar..etc.) | NATO (Yalçin Teknik Inc.) | 1989-1993 |
Konya Kombassan Paper Factory Piled Foundation Design | Kombassan Inc. | 1993 |
Düzce-Akçakoca Road, Landslide Protection Project | General Directorate of Highways (TCK ) | 1993 |
Samsun SSK Hospital Foundation Piles and Anchored Retaining Wall System Design | General Directorate of Social Security | 1992 |
Bursa Law Court Anchored Retaining Wall System Design | Ministry of Public Works | 1992 |
Marmaris Dereyurt and Tasanboyu Tunnels Design | İller Bank | 1991 |
İzmir Sabanci Cultural Center Piled Foundation Design | İzmir Governer | 1991 |
Opera Additional Ballet Building, Mini Piled and Anchored Retaining Wall Design | Ankara Bayındırlık ve İskan Müdürlüğü | 1990 |
Ataköy 7. and 8. Districts Foundation Design | Emlak Kredi Bank | 1985 |
Samsun Water Treatment Plant Geotechnical Consultancy | General Directorate of State Hydraulic Works (DSİ) | 1984 |